How We Work

Quality Control & Inspection Services

We check against an agreed checklist before the container is loaded and hand you a report with photos.

Agreed checklist Check before loading Report with photos

What We Check

From specification to a report with photos One written specification becomes an agreed checklist; the check happens before loading; a report with photos goes to the client. 1 Written specification 2 Agreed checklist 3 Check before loading 4 Report with photos 5 Client reviews
The check happens before loading, when a fix is still possible.
In text: Written specification → Agreed checklist → Check before loading → Report with photos → Client reviews.
Two sourcing staff checking shipment cartons and documents on site in a warehouse
A pre-shipment check against the agreed checklist: cartons and documents verified on site before loading — the last point where a fix is still possible.

Inspection is the fifth stage, before the container is loaded. We check against an agreed checklist and hand you a report with photos. The checklist is agreed with you before the order is placed, so the points to cover are written down rather than decided at the gate.

The checklist follows the same written specification that every factory builds to, including catalogue-external parts and work that happens after assembly.

What Is In The Record

Two people reviewing a report with charts and photographs at a table
A record you can review yourself: what was checked, what was found and what remains open — photographs and conclusions in one file, not a promise in an email.

Where The Boundary Is

Before loading

What we can still change
BasisAgreed checklist
OutputReport with photos
DecisionYours

Certificates

What the factory holds
CheckIssuer, model, batch
SourceThe factory
TestingLicensed third-party lab

Not ours

What we do not claim
We do notIssue certificates
We do notRun production lines
We do notGuarantee output

FAQ

Who writes the checklist?

It is agreed with you before the order is placed, and it follows the written specification every factory builds to.

What do I receive?

A report with photos, the certificates the factory holds, and our own conclusion, separately labelled.

Do you issue test or inspection certificates?

No. Testing goes to a licensed third-party laboratory; we do not issue lab reports.

Can I use inspection without a full sourcing project?

Yes. Scoping a single stage is possible. See Our Services.

Start

Tell us which points need to be on the checklist. We will state what the report will contain and the fee before any work starts.

Ask for a Checklist